• Assembly of the first AMS-02 electrical prototypes E12GT010 and E02GT011:
    • First day (Upilex gluing): 15.8.2000 Davide Vitè pictures
    • Second day (Reinforcement gluing, and Upilex gluing for E02GT011): 16.8.2000
    • Third day (Reinforcement gluing for E02GT011): 17.8.2000
  • Assembly jig (Si alignement): 18.10.2000
  • Bonding jigs with extensions: 15.2.2001
  • Assembly of M15GT005 and some Araldit 138 pictures (don't ask me why): 23.2.2001
  • AMS-02 sensor metallization: 11.3.2001
  • Needle connections in probe station: 28.3.2001
  • Needle connections in probe station: 29.3.2001
  • L09GI005 in the probe station: 9.10.2001
  • Some upilex cutting (with Laser ?) for Peter: 3.12.2001
  • Various clean room pictures take by Martin: 10.1.2002
  • Various assembly pictures. In particular, hybrid gluing and hybrid pictures: 17.1.2002
  • Hybrid gluing (S, K) procedure (in details): 22.1.2002
  • First tests of spacer gluing on hybrid: 24.1.2002
  • First tests of spacer gluing on hybrid: 25.1.2002
  • Accident on L11GI001: 4.2.2002
  • Some pictures of bonds on S-side: 27.3.2002
  • L09GI003 reparation:
    • 30.4.2002
    • 2.5.2002
    • 3.5.2002
    • 7.5.2002
    • 8.5.2002
    • K-hybrid gluing: 15.5.2002
    • S-hybrid gluing: 22.5.2002
  • Configuration to test n-side of AMS02 silicon detector without using a special jig: 17.5.2002
  • S-hybrid gluing, Upilex positioning: 23.5.2002
  • First test of thermal grease dispensing: 19.6.2002
  • Thermal grease dispensing on k-hyb in ladder transp. box: 20.6.2002
  • These pictures show the problem re. 'not sharp hybrid angles': 2.7.2002
  • A leg gluing procedure is decribed here: 3.7.2002
  • Some leg removal tests and ladder manipulation after leg gluing are shown Leg removal: we see the difference between legs anodinizised and not treated, non treated legs do not adhere on glue, while treated legs adhere on glue: 15.7.2002
  • Preperation for the last thermal test is shown: 16.7.2002
  • Thermal test and shieldings: 17.7.2002
  • Pictures of antireflective sensors: 18.7.2002
  • Mech. test: spacer on S-hybrid: 19.7.2002
  • Repair of L09Gi012, picture of SMD, pictures of the 2002 clean room team, and some FAST gluing tests: 12.8.2002
  • Preparation for the cern2002 beam test: 5.9.2002
  • Assembly of two ladders at the same time: 22.2.2003
  • Pictures of the Paris ladder l07gt100:
    • 19.3.2003
    • 21.3.2003
  • Bonds touched during an unhappy operation: 7.4.2003
  • The source test system: 14.4.2003
  • Some picts of ladders with 'leg repair' and some picts of SMD: 27.6.2003
  • Some picts of hybrids: 27.8.2003
  • l15ao094: pictures of a defect on sens15, p-side. It seems to reach some strips. l15an100: pictures of sensor 10, which surface nature allows to clearly observe the implants. P-side: foxfet-like biasing of sensors is visible. N-side: foxfet-like biasing, p-box and p-stop are clearly visible ! Wonderful ! 6.10.2003
  • Scratch on h02gt030, sens Aachen 2220 strip 213: 31.10.2003
  • Pictures of test sensor 97_13/10, also, pics of a scratch: 4.11.2003
  • Phase 2, S-spacer gluing: 24.11.2003
  • phase 2: k-spacer gluing; AMSC: pics of the support structure with planes, Philippe and Su Chun: 26.11.2003
  • end of phase 2: thermal grease dispensing, central column screwing: 27.11.2003
  • Close up view of a VA64hdr9: 28.11.2003
  • Some pictures of AMS01 and AMS02 sensors: 9.12.2003
  • Ladder assembly, spacer gluing: 14.1.2004
  • Ladder assembly, shielding: 15.1.2004
  • Picts of l07gt031 Upilex modification: 21.1.2004
  • Some tests to prepare the hybrid production: 5.2.2004