Software
Reviews and EDMS documentation
- Services FDR
- Schedule (Electronics meeting 21.09.22)
- Documents required for FDR ()
- AT2-IP-QA-0025 (Design overview + slides approval pre-production)
- AT2-IP-QA-0027 (Production flow)
- AT2-IP-QA-0028 (QC test procedures)
- AT2-IP-EN-0038 (Design files PP0-L2)
- AT2-IP-EN-0039 (Design files PP0-L3)
- AT2-IP-EN-0040 (Design files PP0-L4)
- AT2-IP-EN-0050 (Material datasheets)
Production database
Electronics
- Gitlab repository for services
- Gitlab repository for pixel module hybrids
- Gitlab repository for optosystem
- ITk Pixel Modules TWIKI
- Gitlab (UniGe private) repository for PP0
- List of some PCB manufacturers
Prototypes
-
PROTO-0: L3 geometry with L4-4MHz architecture (DPNC 443)
- Mechanical layout, .stp file
- Electrical schematics, .brd file, PCB layers, stackup and BOM.
- Daniel LM's site with design files, photos, etc
- PP0 Prototype 1 - GITLAB
- Measured weights of components:
- Test boards: DPNC442_01 schematics
- Measurements and test-results
Connectors
-
SAMTEC Z-ray
- ZA8H (0.33 mm height): ZA8H product web-page and catalogue page
- Recommended bottom PCB layout for ZA8H
- Press-fit alignment hardware for Z-ray: product web-page and catalogue page. See also additional references for ZSHI hardware.
-
SAMTEC FireFly
- UEC5-1 product web-page, UEC5-1 catalogue page, technical info and surface mount footprint
- UCC8 product web-page, UCC8 catalogue page and surface mount footprint and technical info
- ECUE-12-2 product web-page (micro-flyover assembly), ECUE catalogue page and technical info.
-
SAMTEC CLM and FTM
-
MOLEX ZIF
ASICs
-
RD53B / ITkPixv1
- RD53B quad hybrid (Aleksandra's gitlab)
- RD53B Manual (gitlab)
- RD53B Design Requirements v3.1 (22.02.2019)
-
RD53A
- Module carrier: ItkPixModuleCarrier twiki (including design files)
- Cooling unit: ItkPixCoolingUnit twiki (including design files), assembly instructions (v0.5)
- Power adapter card v2.1 for RD53A quad: design files, Common Hybrid Meeting (18.09.2020)
- SMA-DP adapter card: photo and schematics
- Liverpool hybrid v3.8 for RD53A quad modules (gitlab)
- RD53A Manual v3.51 (19.07.2019)
- RD53A Specifications v3.2 (13.12.2015)
-
MOPS
- new_releases MOPS Specifications v3.1 (11.01.2021)
- Package : SEMPAC QFN64 9x9 (MLP9X9-64-OP-01)
Chip documentation:
Setups, boards, etc:
Chip documentation:
The MOPS (Monitoring Of the Pixel System) is an ASIC used to monitor the voltage of up to 16 modules and the temperatures of up to 15 pixel modules (since for each SP-chain one module NTC is directly connected to the interlock system). It is developed in TSMC 65 nm CMOS technology.
Chip documentation:
Useful documentation
- Nomenclature inclined PP0s
- pdf (all in one file: L-OB-LX-RXX-X-X-RF-X-pdf.zip):
- L-OB-L2-RXX-X-X-RF-1, L-OB-L3-RXX-X-X-RF-1, L-OB-L4-RXX-X-X-RF-1
- L-OB-L2-RXX-X-X-RF-2, L-OB-L3-RXX-X-X-RF-2, L-OB-L4-RXX-X-X-RF-2
- png (all in one file: L-OB-LX-RXX-X-X-RF-X-png.zip):
- ICD Outer Barrel On-detector Services (AT2-IP-MG-0008)
- ITk Pixel Outer Barrel Naming Convention (AT2-IP-ER-0006)
- Twinax data bundles for ITk Pixel Outer Barrel mock-ups (AT2-IP-EP-0019)
- Technical Requirements / Specifications for the ATLAS ITk Pixel Services (AT2-IP-EP-0007)
- Power Consumption Estimate in the ITk Pixel Detector (AT2-IP-EN-0012)
- ITk Interlock System Strategy (AT2-IE-ES-0005)
- ITk Operational Environments (AT2-I-ES-0001)
- ITk High Level Functional Requirements (ATU-SYS-ES-0034)
Meetings
INDICO links
- ITk General
- ITk Pixel General
- ITk Pixel Modules
- ITk Pixel Mechanics
- ITk Pixel Local Suppots & Integration
- ITk Pixel Electronics
- OB meetings
Collaboration
-
OB general meetings
- 3rd OB Workshop (24-26/06/2020)
- OB general meeting: services (20/02/2020): Presentation from SV about links needed in the Type-1 data connectors. Minutes.
- OB general meeting: mechanics (23/01/2020): Presentation from SM about the status of the service integration in the inclined section and from DA about the first proposal on nomenclature and naming convention for the OB mechanical parts. Minutes.
- OB general meeting: services (16/01/2020) and minutes
- 2nd OB Workshop (2-4/12/2019) and minutes
- 1st OB Workshop (4-5/04/2019)
-
Collaboration meetings (Reviews, ITk Weeks, Upgrade Weeks)